News

13-03-2019

MLC 2006 Compliance

MLC 2006 Compliance

On the 5th of March 2019 Rederij Coastwise v.o.f. and affiliated company Coastwise Crewing B.V. received the certifacte for compliance of the Company Management System for Seafarer manning office. Read more

13-03-2019

15 year survey mv Bothnia

15 year survey mv Bothnia

On the 5th of November 2018 mv. Bothnia completed her 3th 5-year survey at Swinoujscie,Poland. During the drydocking maintenance has been done to the sessel hold, bulkhead /tweendeck, hatches, main engine, auxiliary engines and several other auxiliar… Read more

04-10-2017

Drydocking 3rd party vessel.

Drydocking 3rd party vessel.

Last week Rederij Coastwise completed a dry-docking of a vessel, for and on behalf of a third party ship-owner. During the dry docking a complete overhaul of main-engine, steering gear and propulsion system had been carried out. As well maintenance h… Read more

18-01-2017

Sailing Again !

Sailing Again !

Today mv. Bothnia ( Former Flinterbothnia) departed from Rotterdam after an lay-up period of nearly 3,5 months. Together with Thorco Shipping and Coastwise, the Crew worked hard the last weeks to get the vessel ready for sailing uner her new name an… Read more

30-12-2016

High Water - Port of Delfzijl partly flooded.

High Water - Port of Delfzijl partly flooded.

During the Westerly storm on 26th of December 2016 the port of Delfzijl partly flooded during the evening floottide. At the port an level of 3.9 mtr above NAP was exepected. For that reason authorities also closed the barriers in the dike which are p… Read more

02-10-2016

Intermediate survey mv. Flinterbothnia

Intermediate survey mv. Flinterbothnia

On Thursday 29-9-2016 mv. Flinterbothnia passed her intermediate survey at Gdynia (Poland). During the drydocking of 9 days some small repairs, painting ,maintenance, survey's and audits have been performed. After the survey the vessel started w… Read more

26-04-2015

Meeting in Pentland Firth

Meeting in Pentland Firth

On Sunday 26 april 2015 the vessels Flinterbothnia and Flinterbay meet each other in the Pentland Firth. The Flinterbothnia was loaded with a cargo of Waste with destination Muuga. The Flinterbay was on her way to Warrenpoint with a cargo of timber. Read more

07-04-2015

Flinterbothnia roundtrip Iceland

Flinterbothnia roundtrip Iceland

In march 2015, ms. Flinterbothnia made a roundtrip to 4 ports at Iceland with an cargo off 5000 bigbags fertilizer.   - 1st  port Akureyri (Northside) - 2nd port Reydarfjordur (Eastside) - 3th port Hofn (Southside) - 4th port Thorlakshofn (So… Read more

02-02-2015

Awaiting high water

Awaiting high water

Mv. Flinterbothnia waiting for High water at the port of Galway, Ireland. Read more

02-02-2015

Flinterbay at Drogheda

Flinterbay at Drogheda

Flinterbay at Drogheda. On Saturday 24 januari 2015 mv. Flinterbay loaded another cargo of waste-bales for Sweden. Read more

02-12-2014

Coastwise new website

Coastwise new website

Welcome, Today Coastwise is proud to announce her revised website. Here you can find information about services and information regarding vessels in management. Read more