15 year survey mv Bothnia

13-03-2019

On the 5th of November 2018 mv. Bothnia completed her 3th 5-year survey at Swinoujscie,Poland. During the drydocking maintenance has been done to the sessel hold, bulkhead /tweendeck, hatches, main engine, auxiliary engines and several other auxiliaries. Also the vessel name "Bothnia" changed into "Longglory".